Author: Cheng, W.X.
Paper Title Page
MOPEA080 Status of the NSLS-II Injector 273
 
  • T.V. Shaftan, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, G. Ganetis, F. Gao, A. Goel, W. Guo, K. Ha, R. Heese, H.-C. Hseuh, M.P. Johanson, B.N. Kosciuk, S. Kowalski, S.L. Kramer, Y. Li, W. Louie, S. Ozaki, D. Padrazo, J. Rose, S. Seletskiy, S.K. Sharma, G. Shen, O. Singh, V.V. Smaluk, Y. Tian, K. Vetter, W.H. Wahl, G.M. Wang, F.J. Willeke, X. Yang, L.-H. Yu, P. Zuhoski
    BNL, Upton, Long Island, New York, USA
 
  We discuss the current status and plans for developing the NSLS-II injector. The latter consists of a 200 MeV linac, a 3-GeV booster, transport lines and the storage ring injection straight section. The system design and installation are complete. Last year we concluded 200-MeV linac commissioning and are planning to commission the 3 GeV booster during summer of 2013.  
 
THPEA063 NSLS II Injector Integrated Testing 3285
 
  • G.M. Wang, B. Bacha, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, W. Guo, K. Ha, H.-C. Hseuh, Y. Hu, W. Louie, M.A. Maggipinto, D. Padrazo, T.V. Shaftan, G. Shen, O. Singh, Y. Tian, K. Vetter, F.J. Willeke, H. Xu, L. Yang, X. Yang
    BNL, Upton, Long Island, New York, USA
  • P.B. Cheblakov, A.A. Derbenev, A.I. Erokhin, S.M. Gurov, R.A. Kadyrov, S.E. Karnaev, E.A. Simonov, S.V. Sinyatkin, V. Smalyuk
    BINP SB RAS, Novosibirsk, Russia
 
  The NSLS-II is a state of the art 3 GeV synchrotron light source under construction at Brookhaven National Laboratory. Since 2012, the injector system gradually moves to the commissioning stage. It occurs after group people efforts on optics design, equipment specifications, construction and tests, assembly, installation and alignment. It is very important and exciting. To make the commissioning smooth and efficient, an important effort was put on the sub-system integration test to make sure the device function along with utility, timing system and control system, to calibrate diagnostics system and to debug high level application with simulated beam signals and required hardware. In this paper, we report our integration test experience and related control system software development.