Author: Blackler, I.
Paper Title Page
TUPFI076 First RHIC Collider Test Operation at 2.5GeV Beam Energy 1523
 
  • C. Montag, L. A. Ahrens, M. Bai, J. Beebe-Wang, I. Blackler, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, R. Connolly, T. D'Ottavio, K.A. Drees, W. Fischer, C.J. Gardner, X. Gu, M. Harvey, T. Hayes, L.T. Hoff, H. Huang, R.L. Hulsart, J.S. Laster, C. Liu, Y. Luo, G.J. Marr, A. Marusic, F. Méot, K. Mernick, R.J. Michnoff, M.G. Minty, J. Morris, S. Nemesure, V.H. Ranjbar, G. Robert-Demolaize, T. Roser, V. Schoefer, F. Severino, T.C. Shrey, K.S. Smith, S. Tepikian, J.E. Tuozzolo, M. Wilinski, A. Zaltsman, K. Zeno, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
To search for the critical point in the QCD phase diagram, RHIC needs to operate at a set of low gold beam energies between 2.5 and 20 GeV per nucleon. During run 12, first successful collider operation at the lowest energy of 2.5 GeV per nucleon was achieved. We present the challenges and achieved results, and discuss possible future upgrades and improvements.
 
 
TUPFI082 RHIC Performance for FY2012 Heavy Ion Run 1538
 
  • Y. Luo, J.G. Alessi, M. Bai, E.N. Beebe, J. Beebe-Wang, I. Blackler, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, J.J. Butler, R. Connolly, T. D'Ottavio, K.A. Drees, A.V. Fedotov, W. Fischer, C.J. Gardner, D.M. Gassner, X. Gu, Y. Hao, M. Harvey, T. Hayes, L.T. Hoff, H. Huang, P.F. Ingrassia, J.P. Jamilkowski, N.A. Kling, M. Lafky, J.S. Laster, C. Liu, D. Maffei, Y. Makdisi, M. Mapes, G.J. Marr, A. Marusic, F. Méot, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, C. Naylor, S. Nemesure, A.I. Pikin, P.H. Pile, V. Ptitsyn, D. Raparia, G. Robert-Demolaize, T. Roser, P. Sampson, J. Sandberg, V. Schoefer, C. Schultheiss, F. Severino, T.C. Shrey, K.S. Smith, S. Tepikian, P. Thieberger, D. Trbojevic, J.E. Tuozzolo, B. Van Kuik, G. Wang, M. Wilinski, A. Zaltsman, K. Zeno, S.Y. Zhang, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
In the 2012 RHIC heavy ion run, we collided 96.4~GeV U-U ions and 100~GeV Cu-Au ions for the first time in RHIC. The new pre-injector with the electron-beam ion source (EBIS) was used to provide ions for RHIC ion collisions for the first time. By adding the horizontal cooling, the powerful 3-D stochastic cooling largely enhanced the luminosity. With the double bunch merging in the Booster and AGS, the bunch intensities of Cu and Au ions in RHIC surpassed their projections. Both PHENIX and STAR detectors reached their integrated luminosity goals for the U-U and Cu-Au collisions. In this article we review the machine improvement and performance in this run.