Author: Waller, A.M.
Paper Title Page
THPPP023 Momentum Cogging at the Fermilab Booster 3782
 
  • K. Seiya, C.C. Drennan, W. Pellico, A.K. Triplett, A.M. Waller
    Fermilab, Batavia, USA
 
  The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2·1017 protons/hour which is almost double the current operation at 1.1017 protons/hour. The beam loss in the machine is going to be an issue. The booster accelerates beam from 400 MeV to 8GeV and extracts to The Main Injector (MI). Cogging is the process that synchronizes the extraction kicker gap to the MI by changing radial position of the beam during the cycle. The gap creation occurs at about 700MeV which is 6msec into the cycle. The variation of the revolution frequency from cycle to cycle is larger at lower energy and it is hard to control by changing the radial position because of aperture limitations. Momentum cogging is able to move the gap creation earlier by using dipole correctors and radial position feedback, and controlling the revolution frequency and radial position at the same time. The new cogging is going to save energy loss and aperture. The progress of the momentum cogging system development is going to be discussed in this paper.  
 
THPPP024 Alignment and Aperture Scan at the Fermilab Booster 3785
 
  • K. Seiya, J.R. Lackey, W.L. Marsh, W. Pellico, D.A. Still, A.K. Triplett, A.M. Waller
    Fermilab, Batavia, USA
 
  The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2·1017 protons/hour, which is almost double the current operation at 1.1017 protons/hour. The beam loss in the machine is going to be the source of issues. The booster accelerates beam from 400 MeV to 8 GeV and extracts to the Main Injector. Several percent of the beam is lost within 3 msec after the injection. The aperture at injection energy was measured and compared with the survey data. The magnets are going to be realigned in March 2012 in order to increase the aperture. The beam studies, analysis of the scan and alignment data, and the result of the magnet moves will be discussed in this paper.