Author: Van Hoover, Z.
Paper Title Page
THPPR029 A New Control Room for SLAC Accelerators 4029
 
  • R.A. Erickson, E. Guerra, M. Stanek, Z. Van Hoover, J. Warren
    SLAC, Menlo Park, California, USA
 
  Funding: This work was supported by the Department of Energy contract DE-AC02-76SF00515.
We propose to construct a new control room at SLAC to unify and improve the operation of the LCLS, SPEAR3, and FACET accelerator facilities, and to provide the space and flexibility needed to support the LCLS-II and proposed new test beam facilities. The existing control rooms for the linac and SPEAR3 have been upgraded in various ways over the last decade, but their basic features have remained unchanged. We propose to build a larger modern Accelerator Control Room (ACR) in the new Research Support Building (RSB), which is currently under construction at SLAC. Shifting the center of control for the accelerator facilities entails both technical and administrative challenges. In this paper, we describe the motivation and design concept for the ACR and the remaining challenges to completing this project.