Author: Tani, N.
Paper Title Page
MOPPD054 Effect of the 2011 Great East Japan Earthquake in the Injection and Extraction of the J-PARC 3-GeV RCS 490
 
  • P.K. Saha, H. Harada, H. Hotchi, S.I. Meigo, N. Tani, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  In the 3-GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC), the injection and extraction systems play important roles for the beam injection and extraction, respectively. Unfortunately, the 2011 great east Japan earthquake had a serious impact on the ongoing schedule due to the big damage of the whole accelerator facility and the infrastructure as well. The injection and extraction including the beam transport lines magnets suffered a noticeable displacement resulting with alignment errors. As realignment of the RCS magnets can not be done in this year, then based on the post earthquake measured alignment data, we have estimated the effect as well as possible solutions on the injected and extracted beam for as usual operation. Fortunately, the simulation results shows that there would not be any serious impact on both injected as well as extracted beam with present alignment errors and thus user operation can be resume as expected. The simulation result together with some experimental results will be presented.  
 
WEPPP085 Study on the Realignment Plan for J-PARC 3 GeV RCS after the Tohoku Earthquake in Japan 2909
 
  • N. Tani, H. Hotchi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  J-PARC 3GeV RCS suffered the big damage to its building and cooling and electric facilities by the Tohoku Region Pacific Coast Earthquake on March 11, 2011. After the earthquake, RCS magnets were measured to confirm the state of accelerator beam line. As a result, it was found out that there was an alignment error of several millimeters in both horizontal and vertical directions that caused a deformation in the J-PARC 3GeV RCS tunnel. In this paper, we report the survey result in the accelerator tunnel after the earthquake and the realignment plan for J-PARC 3GeV RCS.  
 
THPPD051 New Power Supply of the Injection Bump Magnet for Upgrading the Injection Energy in the J-PARC 3-GeV RCS 3626
 
  • T. Takayanagi, N. Hayashi, M. Kinsho, N. Tani, T. Togashi, T. Ueno
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  With the energy upgrading of LINAC (Linear accelerator) to 400 MeV in the J-PARC (Japan Proton Accelerator Research Complex), a new power supply of the injection bump magnet has been designed for the 3-GeV RCS (Rapid Cycling Synchrotron). The new power supply is composed with the capacitor bank which has function to form the output current pattern. This power supply is a commutation strategy using the electrical charge and discharge of the capacitor, and the frequency of the switch that becomes the source of the noise is a little. Comparing to the conventional switching-type power supply, this power supply is switched only twice for the pattern formation. Thus, the ripple due to the switching can be expected to be much lower. The 1/16 scale model was manufactured and the characteristics was evaluated. This paper summarizes the design parameter and the experimental result of the new power supply.  
 
THPPP081 Status of Injection Energy Upgrade for J-PARC RCS 3921
 
  • N. Hayashi, H. Harada, H. Hotchi, J. Kamiya, P.K. Saha, Y. Shobuda, T. Takayanagi, N. Tani, M. Watanabe, Y. Watanabe, K. Yamamoto, M. Yamamoto, Y. Yamazaki, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken, Japan
 
  The injection energy upgrade for J-PARC RCS is planed in 2013. This includes the power supplies upgrade of injection pulsed magnet system, suppression for leakage field, quadrupole correction magnets, reduction of kicker impedance effect and improvements of beam diagnostic instrumentation. The paper reports the present status.