Author: Sawamura, M.
Paper Title Page
MOOBC02 Status of Main Linac Cryomodule Development for Compact ERL Project 67
 
  • K. Umemori, K. Enami, T. Furuya, H. Sakai, M. Satoh, K. Shinoe
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • M. Sawamura
    JAEA, Ibaraki-ken, Japan
 
  The Compact ERL, which is a test facility of ERL, is under construction at KEK, in Japan. For the main linac, one cryomodule, containing two 9-cell superconducting cavities, is under development. The cryomodule has been designed under High Pressure Gas Safety Code in Japan. Thermal design and cavity alignment have been also carefully considered. Two 9-cell cavities were already fabricated and their performances were confirmed by vertical tests. They satisfied ERL main linac specifications. Their accelerating field reached to 25 MV/m, without field limits. Two input couplers, three HOM absorbers and two Slide-Jack tuners are also under fabrication for the cryomodule. High power processing will be applied for input couplers, at a test stand using a 300 kW klystron. Cooling tolerance and HOM damping abilities were tested for HOM absorbers. Some performance studies were also applied for the tuner at room temperature condition. Cryomodule assembly is planned on this summer. After cooling tests and high power tests will be carried out, ERL beam operation will be started.  
slides icon Slides MOOBC02 [3.849 MB]  
 
WEPPC011 Vertical Test Results for ERL 9-cell Cavities for Compact ERL Project 2227
 
  • K. Umemori, T. Furuya, H. Sakai, M. Satoh, K. Shinoe
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • M. Sawamura
    JAEA, Ibaraki-ken, Japan
 
  The Compact ERL project, which is a test facility of ERL, is ongoing in Japan. At the first step of this project, main linac cavities accelerate electron beams by 30 MV. Two 9-cell cavities were fabricated for main linac cryomodule, under High Pressure Gas Safety Code in Japan. A series of surface treatments, such as annealing, pre-tuning, electro-polishing (EP), degreasing, high pressure rinsing by ultra-pure water, cavity assembly and baking, were applied for the cavities. For the final EP, current density was selected to be relatively low. Vertical tests were performed for both cavities. Their field successfully reached to 25 MV/m, without any field limitation. The Q-values were more than 1x1010, even at 20 MV/m. Field emission on-sets were to be 14 and 22 MV/m, for each cavities. Both cavities satisfied requirements for ERL main linac cavity. Details of vertical tests, with X-ray and temperature mapping data, are shown, in this paper. These cavities will be mounted with titanium He jackets, assembled and installed into a cryomodule.  
 
MOPPC070 Field Emission Simulation for KEK-ERL 9-Cell Superconducting Cavity 295
 
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • T. Furuya, H. Sakai, M. Satoh, K. Shinoe, K. Umemori
    KEK, Ibaraki, Japan
  • M. Sawamura
    JAEA/ERL, Ibaraki, Japan
 
  In order to develop the Energy Recovery Linac at KEK, we are studying the performance of L-band superconducting cavities by means of vertical tests. One of the limiting factor for the cavities performance is power losses due to field emitted electrons. With regard to this phenomena, a particle tracking code is used to study electron trajectories and deposited energy on the inner surface of the cavity. Different emitters location were tested within a range of accelerating field and phases in order to reproduce different scenario. The final goal of this study is to locate the sources of the electrons inside the cavity through a deeper understanding of the phenomena. To validate the results from the simulation the outcome data are compared with other particle tracking codes.