Author: Park, I.S.
Paper Title Page
WEPPC023 Status and Progress of RF System for the PLS-II Storage Ring 2254
 
  • M.-H. Chun, J.Y. Huang, Y.D. Joo, H.-S. Kang, H.-G. Kim, C.D. Park, H.J. Park, I.S. Park, Y.U. Sohn, I.H. Yu
    PAL, Pohang, Kyungbuk, Republic of Korea
 
  Funding: Supported by the Korea Ministry of Science and Technology
The RF system for the Pohang Light Source (PLS) storage ring was upgraded for PLS-II project of 3.0GeV/400mA from 2.5GeV/200mA. the RF system is commissioning with five normal conducting(NC) RF cavities at total maximum RF power of 280kW to the cavities with two 300kW klystron and two 75kW klystron amplifiers in 2011. The super conducting(SC) cavities will be installed on August 2012 because of long delivery. Therefore three NC RF cavities will be replaced with two SC cavities with cryomodules, and operated with cryogenics, digital low level, and 300kW klystron high power system. Also we are preparing the third SC cavity stand to increase the storage ring current up to 400mA with all insertion devices operation. This paper describes the present installation, commissioning, operation status, upgrade progress, and future plan of the RF system for the upgraded project of PLS-II storage ring.
 
 
WEPPC024 Preliminary Test of Superconducting RF Cavities for PLS-II 2257
 
  • Y.U. Sohn, M.-H. Chun, J.Y. Huang, Y.D. Joo, H.-S. Kang, H.-G. Kim, S.H. Nam, C.D. Park, H.J. Park, I.S. Park, I.H. Yu
    PAL, Pohang, Kyungbuk, Republic of Korea
 
  Funding: This project is supported by the Korea Ministry of Science and Technology.
The main part of the Installation for the PLS-II upgrade was finished in June and is on the way to user operation through elaborate commissioning. Up to now, the achievement is 150 mA beam current at 3 GeV with multi-bunch mode with 5 normal conducting cavities which served in the PLS before. After installation of 2 SRF cavities in the summer of 2012, the PLS-II will have 300 mA beam current with 20 IDs by 2 superconducting RF cavities until July, 2014. Finally, one more superconducting cavity will be added in August, 2014, and beam current will rise to 400 mA. The two SRF cavities are under test and conditioning. The two main subsystems, SRF cavities and ceramic windows were tested independently to confirm their performance. Each cavity recorded its accelerating voltage as 3.27 MV and 3.24 MV at 4.2K, respectively. Two RF windows also passed their specification, 300 kW CW traveling wave and 150 kW CW standing wave. The preliminary tests of SRF cryomodules are reported in the presentation.
 
 
TUOBB02 Commissioning of the PLS-II 1089
 
  • S. Shin, J.Y. Choi, T. Ha, J.Y. Huang, I. Hwang, W.H. Hwang, Y.D. Joo, C. Kim, D.T. Kim, D.E. Kim, J.M. Kim, M. Kim, S.H. Kim, S.-C. Kim, S.J. Kwon, B.-J. Lee, E.H. Lee, H.-S. Lee, H.M. Lee, J.W. Lee, S.H. Nam, E.S. Park, I.S. Park, S.S. Park, S.J. Park, Y.G. Son, J.C. Yoon
    PAL, Pohang, Kyungbuk, Republic of Korea
  • J-Y. Kim, B.H. Oh
    KAERI, Daejon, Republic of Korea
  • J. Lee
    POSTECH, Pohang, Kyungbuk, Republic of Korea
 
  The Pohang Light Source (PLS) has operated for 14 years successfully. To meet the request of the increasing user community, the PLS-II that is the upgrade project of PLS has been completed. Main goals of the PLS-II are to increase beam energy to 3 GeV, to increase number of insertion devices by the factor of two (20 IDs), to increase beam current to 400 mA and to reduce beam emittance below 10 nm with existing PLS tunnel and injection system. The PLS-II had been commissioned over the six months. During commissioning, we achieved 14 insertion devices operation and top-up operation with 100 mA beam current and 5.8 nm beam emittance. In this presentation, we report the experimental results from the PLS-II commissioning.  
slides icon Slides TUOBB02 [3.484 MB]