Author: Kostin, R.A.
Paper Title Page
THPPP063 CW Room Temperature Re-buncher for the Project X Front End 3880
 
  • G.V. Romanov, M.H. Awida, M. Chen, I.V. Gonin, S. Kazakov, R.A. Kostin, V.A. Lebedev, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  At Fermilab there is a plan to construct the Project X Injector Experiment (PXIE) facility - a prototype of the front end of the Project X, a multi-MW proton source based on a superconducting linac. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element within the Project. The front end of the linac contains a cw room-temperature MEBT section which comprises an ion source, RFQ, and high-bandwidth bunch selective chopper. The length of the MEBT exceeds 9 m, so three re-bunching cavities are used to support the beam longitudinal dynamics. The paper reports RF design of the re-bunchers along with preliminary beam dynamic and thermal analysis of the cavities.  
 
THPPR012 Lorentz Force Compensation for Long Pulses in SRF Cavities 3990
 
  • Y.M. Pischalnikov, G.I. Cancelo, B. Chase, D.J. Crawford, D.R. Edstrom, Jr, E.R. Harms, R.A. Kostin, W. Schappert, N. Solyak
    Fermilab, Batavia, USA
 
  Lorentz force compensation of 8ms pulses in Tesla style elliptical cavities has been studied in Fermilab SRF Test Facility. Detuning measurements and compensation results are presented.