Author: Karns, P.R.
Paper Title Page
THPPP065 The FNAL Injector Upgrade Status 3886
 
  • C.-Y. Tan, D.S. Bollinger, K.L. Duel, P.R. Karns, J.R. Lackey, W. Pellico, V.E. Scarpine, R.E. Tomlin
    Fermilab, Batavia, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
The new FNAL H injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H source, low energy beam transport (LEBT) and 200 MHz RFQ. Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.