Author: Huang, C.S.
Paper Title Page
WEPPD024 A Study of Vacuum Pressure in TPS Cells 2552
 
  • L.H. Wu, J.-R. Chen, C.M. Cheng, G.-Y. Hsiung, C.S. Huang, Huang, Y.T. Huang
    NSRRC, Hsinchu, Taiwan
 
  Recently, the type-2 and type-3 TPS cells are installed and pumped down into vacuum status. The pumping down curves of the type-2 and type-3cells, including R03, R06, R07, R10, and R11, are recorded after on-site welding and after assembling without leakage, individually. In the R03, R06, R07, R10 cells, the pumping down curve after assembling without leakage is a little higher than that after on-site welding. In those four cells, the pumping down curve after assembling all vacuum components and pumps is similar. However, in the R11 cell, it was found that the pumping down curve after assembling without leakage is almost along that of after on-site welding. The slope of pumping down curve near 1 hour in the R11 cell is -1.52, while that in the R10 cell is -1.39. It means that the vacuum pressure in the R11 cell is apparently improved. It is confirmed that the vacuum chambers are cleaned by the same process and the assembling components are similar. Besides, the photon stopper chambers are all pre-baked to 200 oC for the same time. We try to investigate the residual gas analysis (RGA) data to find the true reasons.