Author: Hu, Y.
Paper Title Page
MOPPR094 Preparation for NSLS II Linac to Booster Transport Line Commissioning 1002
 
  • G.M. Wang, M.A. Davidsaver, R.P. Fliller, G. Ganetis, H.-C. Hseuh, Y. Hu, D. Padrazo, T.V. Shaftan, G. Shen, O. Singh, Y. Tian, H. Xu, L. Yang
    BNL, Upton, Long Island, New York, USA
 
  The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The first part of the Linac to Booster Transport (LBT) line has been installed for the linac commissioning. This part will be used for the linac acceptance test. In this paper, we describe the preparation of the LBT sub-system integration test and the high level applications.