Author: Hanna, B.M.
Paper Title Page
MOPPR072 Fermilab PXIE Beam Diagnostics Development and Testing at the HINS Beam Facility 954
 
  • V.E. Scarpine, B.M. Hanna, V.A. Lebedev, L.R. Prost, A.V. Shemyakin, J. Steimel, M. Wendt
    Fermilab, Batavia, USA
 
  Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359.
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H beam up to 30 MeV. Some of the major goals of the project are to test a cw RFQ and H source, a broadband bunch-by-bunch beam chopper and a low-energy superconducting linac. The successful characterization and operation of such an accelerator places stringent requirements on beam line diagnostics. These crucial beam measurements include bunch currents, beam orbit, beam phase, bunch length, transverse profile and emittance, beam halo and tails, as well as the extinction performance of the broadband chopper. This paper presents PXIE beam measurement requirements and instrumentation development plans. Also presented are plans to test many of these instruments at the Fermilab High Intensity Neutrino Source (HINS) beam facility. Since HINS is already an operational accelerator, utilizing HINS for instrumentation testing allows for quicker development of the required PXIE diagnostics.
 
 
THPPP062 The Six-Cavity Test - Demonstrated Acceleration of Beam with Multiple RF Cavities and a Single Klystron 3877
 
  • J. Steimel, J.-P. Carneiro, B. Chase, S. Chaurize, E. Cullerton, B.M. Hanna, R.L. Madrak, R.J. Pasquinelli, L.R. Prost, L. Ristori, V.E. Scarpine, P. Varghese, R.C. Webber, D. Wildman
    Fermilab, Batavia, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
The High Intensity Neutrino Source (HINS) ‘Six-Cavity Test’ has demonstrated the use of high power RF vector modulators to control multiple RF cavities driven by a single high power klystron to accelerate a non-relativistic beam. Installation of 6 cavities in the existing HINS beamline has been completed and beam measurements have started. We present data showing the energy stability of the 7 mA proton beam accelerated through the six cavities from 2.5 MeV to 3.4 MeV.