Author: Grant, A.F.
Paper Title Page
TUPPD004 Costing Methodology and Status of the Neutrino Factory 1410
 
  • A. Kurup
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • N. Bliss, N.A. Collomb, A.F. Grant
    STFC/DL, Daresbury, Warrington, Cheshire, United Kingdom
 
  The International Design Study for the Neutrino Factory will produce a reference design report in 2013 that will contain a detailed performance analysis of the Neutrino Factory and a cost estimate. In order to determine the cost a number of engineering features need to be included in the accelerator physics design, which can require the physics design to be re-optimized. The cost estimate is determined in such a way as to make efficient use of the engineering resources available and to simplify the process of modifying the physics design to include engineering features. This paper will present details of the methodology used to determine the cost estimate and the current status of each subsystem.