Author: Boehme, C.     [Böhme, C.]
Paper Title Page
MOPPD007 Towards Routine Operation of the Scintillation Profile Monitor at COSY 382
 
  • V. Kamerdzhiev, J. Dietrich, K. Reimers
    FZJ, Jülich, Germany
  • C. Böhme
    ESS, Lund, Sweden
  • A. Pernizki
    INP, Jülich, Germany
 
  The optics of the Scintillation Profile Monitor (SPM) was modified to correct the large error observed in previous measurements. Beam profile measurements were carried out after reinstallation in the COSY ring, showing reasonable agreement with profiles, measured with the ionization profile monitor. Performance of the SPM is analyzed. Application of the method in a proton synchrotron is discussed.  
 
MOPPR045 Beam Diagnostics for ESS 882
 
  • A. Jansson, C. Böhme, B. Cheymol, H. Hassanzadegan, T.J. Shea, L. Tchelidze
    ESS, Lund, Sweden
 
  The European Spallation Source (ESS), to be built in the south of Sweden, will use a 2.5 GeV superconducting linac to produce the worlds most powerful neutron source. The project is currently in a pre-construction phase, during which the linac design is being updated. This paper describes the current plans for beam diagnostics in terms of requirements, number and locations of different systems, and possible technical solutions.