Author: Anders, W.
Paper Title Page
FRAAC3 Status of the HOM Calculations for the BERLinPro Main Linac Cavity 278
 
  • A. Neumann, W. Anders, J. Knobloch
    HZB, Berlin, Germany
  • K. Brackebusch, T. Flisgen, T. Galek, K. Papke, U. van Rienen
    Rostock University, Faculty of Computer Science and Electrical Engineering, Rostock, Germany
  • B. Riemann, T. Weis
    DELTA, Dortmund, Germany
 
  Funding: Work supported by Federal Ministry for Research and Education BMBF under contract 05K10HRC
The Berlin Energy Recovery Linac Project (BERLinPro) is designed to develop and demonstrate CW LINAC technology and expertise required to drive next-generation Energy Recovery Linacs (ERLs). Strongly higher order mode (HOM) damped multicell 1.3 GHz cavities are required for the main linac. The cavity under study is an integrated design of the Cornell base cell with JLab HOM waveguide couplers. Modifications to the end group design have also been pursued, including the substitution of one waveguide by a HZB-modified TTF-III power coupler. In this talk the progress in HOM calculations to avoid beam-breakup instabilities for the favored cavity structure will be presented.
 
slides icon Slides FRAAC3 [15.439 MB]