Author: Przygoda, K.P.
Paper Title Page
TUPHA125 The Bunch Arrival Time Monitor at FLASH and European XFEL 701
 
  • M. Viti, M.K. Czwalinna, H. Dinter, C. Gerth, K.P. Przygoda, R. Rybaniec, H. Schlarb
    DESY, Hamburg, Germany
 
  In modern free electron laser facilities like FLASH I/II and European XFEL at DESY a high resolution intra bunch train arrival time measurement is mandatory, providing a crucial information for the beam based feedback system. For this purpose a Bunch Arrival Time Monitor (BAM) was developed, based on an electro-optical scheme where an ultra-short pulsed laser is employed. A BAM is composed of several subsystems, including stepper motors, power management, dedicated readout board, management board for voltage settings, temperature sensors and temperature controller and optical amplifier. Part of the electronics is developed using the MicroTCA standard. We will present in this poster the basic requirements for the BAM, software design and implementation developed to manage the subsystems and their interactions.  
poster icon Poster TUPHA125 [1.356 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2017-TUPHA125  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)