TUPHA201 UNICOS Framework and EPICS: A Possible Integration 915
 
  • M. Ritzert
    Heidelberg University, Heidelberg, Germany
  • E. Blanco Viñuela, M. Ostrega, L. Zwalinski
    CERN, Geneva, Switzerland
 
  Funding: This work has been supported by the German Federal Ministry of Education and Research (BMBF).
UNICOS (UNified Industrial Control System) is a CERN-made framework to develop industrial control applications. It follows a methodology based on ISA-88 and provides components in two layers of a control system: control and supervision. The control logic is running in the first layer, in a PLC (Programmable Logic Controller), and, in the second layer, a SCADA (Supervisory Control and Data Acquisition) system is used to interface with the operators and numerous other features (e.g. alarms, archiving, etc.). UNICOS supports SIEMENS WinCC OA as the SCADA system. In this paper, we propose to use EPICS (Experimental Physics and Industrial Control System) as the supervision component of the UNICOS framework. The use case is the control system of a CO2 cooling plant developed at CERN following the UNICOS methodology, which had to be integrated in a control system based on EPICS. The paper describes the methods and actions taken to make this integration feasible, including automatic EPICS database generation, PLC communications, visualization widgets, faceplates and synoptics and their integration into CSS and EPICS, as well as the integration with the BEAST alarm system.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2017-TUPHA201  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPHA050 Development, Commissioning and Operation of the Large Scale CO2 Detector Cooling Systems for CMS Pixel Phase I Upgrade 1478
 
  • M. Ostrega, J. Daguin, S. Pavis, P. Petagna, P. Tropea, B. Verlaat, L. Zwalinski
    CERN, Geneva, Switzerland
 
  During the 2017 Year-end Technical Stop of the Large Hadron Collider at CERN, the CMS experiment has successfully installed a new pixel detector in the frame of Phase I upgrade. This new detector will operate using evaporative CO2 technology as its cooling system. Carbon Dioxide, as state of the art technology for current and future tracking detectors, allows for significant material budget saving that is critical for the tracking performance. The road towards operation of the final CO2 cooling system in the experiment passed through intensive prototype phase at the CMS Tracker Integration Facility (TIF) for both cooling process hardware and its control system. This paper briefly describes the general design of both the CMS and TIF CO2 detector cooling systems, and focuses on control system architecture, operation and safety philosophy, commissioning results and operation experience. Additionally, experience in using the Ethernet IP industrial fieldbus as distributed IO is presented. Various pros and cons of using this technology are discussed, based on the solutions developed for Schneider Premium PLCs, WAGO and FESTO IOs using the UNICOS CPC 6 framework of CERN.  
poster icon Poster THPHA050 [2.879 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2017-THPHA050  