TUPHA206 Upgrade of the ISIS Muon Front End Magnets: Old and New Instrument Control Systems Working in Harmony 939
 
  • K.V.L. Baker, F.A. Akeroyd, M.J. Clarke, D.P. Keymer, T. Löhnert, C. Moreton-Smith, D.E. Oram
    STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
  • J.R. Holt, A.T. Potter, I.H. Rey, T. A. Willemsen, K. Woods
    Tessella, Abingdon, United Kingdom
  • J.S. Lord
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
 
  When the European Muon beamlines at the ISIS pulsed neutron and muon source [1] upgraded their front end magnets, it was desired that these new magnets should be controllable remotely. This work was undertaken by the team responsible for instrument control, who are in the process of a phased upgrade of instrument control software from a locally developed system (SECI) to an EPICS [2] based one (IBEX [3,4]). To increase the complexity of the task, parts of the front end needed to be controlled only by an individual instrument beamline, whilst some values needed to be tuned to the best compromise available for all three beamlines. Furthermore, the muon instruments were not ready for an upgrade to a full IBEX system at that time. By combining SECI, IBEX and the Mantid [5] data reduction package the required control and tuning has been achieved. This paper will give details of the challenges, the topology of the solution, how the current mixed system is performing, and what will be changed when the muon instruments are converted to IBEX.  
poster icon Poster TUPHA206 [1.005 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2017-TUPHA206  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)