Paper | Title | Other Keywords | Page |
---|---|---|---|
MOPGF087 | TPS Booster Tune Measurement System | booster, injection, power-supply, photon | 274 |
|
|||
The TPS is a state-of-the-art synchrotron radiation facility featuring ultra-high photon brightness with extremely low emittance. Its Booster has 6 FODO cells which include 7 BD dipoles with 1.6 m long and 2 BH dipoles with 0.8 m long in each cell. After magnetization of stainless steel vacuum chamber of the booster were identified and then dismantled, annealed, and re-installed, the electron beam energy of the Taiwan Photon Source (TPS) in the booster ring has ramped to 3 GeV in a week. The booster tune correction during ramping is one of the main reasons why the booster commissioning progress is so fast. In this paper the summarized the booster tune monitor system will be summarised | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
MOPGF131 | Interlock System for Machine Protection at ThomX Accelerator | vacuum, PLC, operation, controls | 386 |
|
|||
ThomX is a Compton based photons source. It aims to produce a compact and directional X-rays source, with high performance, high brightness and adjustable energy*. The principal application fields are medical sciences, social technology and industry. An interlock system has been implemented for machine protection, especially to protect sensitive and essential equipment (magnets, vacuum system, etc.) during machine operation. ThomX interlock system is based on Programmable Logic Controller (PLC-Siemens S7-1500), it collects default signals from the different equipment of the machine, up to the central PLC which kills the beam, by stopping the RF or the injection, in case of problem (bad vacuum, magnets overheating, etc.). The interlock system consists of two levels. The first one is a local process, whose role is to monitor the variations of different parameters of the machine equipment, and generates a default signal in case of operation problem. The second level is the central PLC, which gathers and process all the default signals from subsystems, and stops the RF power in a very short time. Actually, the interlock system is under test, it will allow accelerator to work safely.
*C. Bruni et al.,'ThomX - Conceptual Design Report', 2009, pp.1-136. |
|||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||