MOA3O02 The Large Scale European XFEL Control System: Overview and Status of the Commissioning 5
 
  • R. Bacher, A. Aghababyan, P.K. Bartkiewicz, T. Boeckmann, B. Bruns, M.R. Clausen, T. Delfs, P. Duval, L. Fröhlich, W. Gerhardt, C. Gindler, J. Hatje, O. Hensler, J.M. Jäger, R. Kammering, S. Karstensen, H. Keller, V. Kocharyan, O. Korth, A. Labudda, T. Limberg, S.M. Meykopff, M. Möller, J. Penning, A. Petrosyan, G. Petrosyan, L.P. Petrosyan, V. Petrosyan, P. Pototzki, K.R. Rehlich, S. Rettig-Labusga, H.R. Rickens, G. Schlesselmann, B. Schoeneburg, E. Sombrowski, M. Staack, C. Stechmann, J. Szczesny, J. Wilgen, T. Wilksen, H. Wu
    DESY, Hamburg, Germany
  • S. Abeghyan, A. Beckmann, D. Boukhelef, N. Coppola, S.G. Esenov, B. Fernandes, P. Gessler, G. Giambartolomei, S. Hauf, B.C. Heisen, S. Karabekyan, M. Kumar, L.G. Maia, A. Parenti, A. Silenzi, H. Sotoudi Namin, J. Szuba, M. Teichmann, J. Tolkiehn, K. Weger, J. Wiggins, K. Wrona, M. Yakopov, C. Youngman
    XFEL. EU, Hamburg, Germany
 
  The European XFEL is a 3.4km long X-ray Free Electron Laser in the final construction and commissioning phase in Hamburg. It will produce 27000 bunches per second at 17.5GeV. Early 2015 a first electron beam was produced in the RF-photo-injector and the commissioning of consecutive sections is following during this and next year. The huge number and variety of devices for the accelerator, beam line, experiment, cryogenic and facility systems pose a challenging control task. Multiple systems, including industrial solutions, must be interfaced to each other. The high number of bunches requires a tight time synchronization (down to picoseconds) and high performance data acquisition systems. Fast feedbacks from front-ends, the DAQs and online analysis system with a seamless integration of controls are essential for the accelerator and the initially 6 experimental end stations. It turns out that the European XFEL will be the first installation exceeding 2500 FPGA components in the MicroTCA form factor and will run one of the largest PROFIBUS networks. Many subsystem prototypes are already successfully in operation. An overview and status of the XFEL control system will be given.  
slides icon Slides MOA3O02 [3.105 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOD3O05 Use of Automation in Commissioning Process of the Undulators of the European X-Ray Free Electron Laser 64
 
  • S. Karabekyan, J. Pflüger
    XFEL. EU, Hamburg, Germany
  • L. Lin, Y.T. Liu
    USTC/NSRL, Hefei, Anhui, People's Republic of China
  • W. Wang
    Hisense Co. Ltd., Qingdao, People's Republic of China
 
  For operation of the three undulator systems of the European XFEL, a total of 91 undulators are needed and have been produced. For production, magnetic measurements, tuning and commissioning of these devices only two years were foreseen by the project schedule. For these purposes, automated and optimized procedures were needed to accomplish a number of workflows, time-consuming adjustments and commissioning tasks. We created several automation programs which allowed us to reduce the time spent on the commissioning of the control system by an order of magnitude.  
slides icon Slides MOD3O05 [4.208 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)