Author: Daligault, F.
Paper Title Page
MOPGF104 Consolidations on the Vacuum Controls of the CERN Accelerators, During the First Long Shutdown of the LHC 322
 
  • P. Gomes, F. Antoniotti, F. Aragon, F. Bellorini, S. Blanchard, J-P. Boivin, N. Chatzigeorgiou, F. Daligault, R. Ferreira, J. Fraga, J. Gama, A. Gutierrez, P. Krakówski, H.F. Pereira, G. Pigny, P.P. Prieto, B. Rio, H. Vestergard
    CERN, Geneva, Switzerland
  • L. Kopylov, S. Merker, M.S. Mikheev
    IHEP, Moscow Region, Russia
 
  For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It was mainly motivated by the consolidation of magnet interconnects, to allow operation with 6.5 TeV proton beams. Moreover, around the accelerator complex, many other systems were repaired, consolidated or upgraded, and several new installations came to life. The standardization of vacuum controls has progressed in the injectors, with the renovation of most of their obsolete equipment. In the LHC, many new instruments were added, the signal transmission integrity was improved, and the exposure to radiation was reduced in critical places. Several developments were needed for new equipment types or new operational requirements.  
poster icon Poster MOPGF104 [16.021 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)