Keyword: gun
Paper Title Other Keywords Page
THPPC103 Timing System at MAX IV timing, linac, injection, storage-ring 1300
 
  • J.J. Jamroz, V.H. Hardion, J. Lidón-Simon, L. Malmgren, A.M. Milán, A.M. Mitrovic, R. Nilsson, M. Sjöström, D.P. Spruce
    MAX-lab, Lund, Sweden
 
  The MAX IV Laboratory is the successor of the MAX-lab national laboratory in Sweden. The facility is being constructed at Brunnshög in the North Eastern part of Lund and will contain one long linac 3GeV (full energy injector), two storage rings (SR 1.5GeV and SR 3GeV) and a short pulse facility (SPF). This paper describes the design status of the timing system in 2013.  
poster icon Poster THPPC103 [7.134 MB]