Keyword: dumping
Paper Title Other Keywords Page
MOPPC066 Reliability Analysis of the LHC Beam Dumping System Taking into Account the Operational Experience during LHC Run 1 operation, controls, power-supply, diagnostics 250
 
  • R. Filippini, E. Carlier, N. Magnin, J.A. Uythoven
    CERN, Geneva, Switzerland
 
  The LHC beam dumping system operated reliably during the Run 1 period of the LHC (2009 – 2013). As expected, there were a number of internal failures of the beam dumping system which, because of in-built safety features, resulted in safe removal of the particle beams from the machine. These failures (i.e. "false" beam dumps) have been appointed to the different failure modes and are compared to the predictions made by a reliability model established before the start of LHC operation. A statistically significant difference between model and failure data identifies those beam dumping system components that may have unduly impacted on the LHC availability and safety or might have been out of the scope of the initial model. An updated model of the beam dumping system reliability is presented, taking into account the experimental data presented and the foreseen system changes to be made in the 2013 – 2014 LHC shutdown.  
poster icon Poster MOPPC066 [1.554 MB]  
 
MOPPC068 Operational Experience with a PLC Based Positioning System for a LHC Extraction Protection Element controls, PLC, operation, software 254
 
  • C. Boucly, J. Borburgh, C. Bracco, E. Carlier, N. Magnin, N. Voumard
    CERN, Geneva, Switzerland
 
  The LHC Beam Dumping System (LBDS) nominally dumps the beam synchronously with the passage of the particle free beam abort gap at the beam dump extraction kickers. In the case of an asynchronous beam dump, an absorber element protects the machine aperture. This is a single sided collimator (TCDQ), positioned close to the beam, which has to follow the beam position and beam size during the energy ramp. The TCDQ positioning control is implemented within a SIEMENS S7-300 Programmable Logic Controller (PLC). A positioning accuracy better than 30 μm is achieved through a PID based servo algorithm. Errors due to a wrong position of the absorber w.r.t. the beam energy and size generates interlock conditions to the LHC machine protection system. Additionally, the correct position of the TCDQ w.r.t. the beam position in the extraction region is cross-checked after each dump by the LBDS eXternal Post Operational Check (XPOC). This paper presents the experience gained during LHC Run 1 and describes improvements that will be applied during the LHC shutdown 2013 – 2014.  
poster icon Poster MOPPC068 [3.381 MB]