Paper |
Title |
Other Keywords |
Page |
THPPC051 |
First Operation of New Electron Beam Orbit Measurement System at SIBERIA-2 |
electron, controls, radiation, synchrotron |
1186 |
|
- Y.A. Fomin, V. Korchuganov, N.I. Moseiko, S.I. Tomin, A.G. Valentinov
NRC, Moscow, Russia
- R. Hrovatin, P. Leban
I-Tech, Solkan, Slovenia
|
|
|
The paper focuses on the results of commission and usage of the electron beam orbit measurement system at synchrotron radiation source SIBERIA-2 realized at present time at Kurchatov Institute. The main purpose of new orbit measurement system creation is an improvement of the electron beam diagnostic system at the storage ring. This system provides continuous measurements of the electron beam closed orbit during storing, ramping and operation for users. Besides, with the help of the system it is possible to carry out turn-by-turn measurements of the electron beam trajectory during injection process. After installation of new orbit measurement system we obtained a very good instrument to study electron beam dynamics into the main storage ring in detail. The paper describes the new orbit measurement system, its technical performance, the results of commission and our experience.
|
|
|