Author: Stabile, P.
Paper Title Page
TUPF19 Beam Position Monitor Electronics Upgrade for Fermilab Switchyard 365
 
  • P. Stabile, J.S. Diamond, J. Fitzgerald, N. Liu, D.K. Morris, P.S. Prieto, J.P. Seraphin
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359
The beam position monitor (BPM) system for Fermilab Switchyard (SY) provides the position, intensity and integrated intensity of the 53.10348MHz RF bunched resonant extracted beam from the Main Injector over 4 seconds of spill. The total beam intensity varies from 1x1011 to 1x1013 protons. The spill is measured by stripline beam postion monitors and resonant circuit. The BPMs have an external resonant circuit tuned to 53.10348MHz. The corresponding voltage signal out of the BPM has been estimated to be between -110dBm and -80dBm.
 
poster icon Poster TUPF19 [5.622 MB]  
Export • reference for this paper to ※ LaTeX, ※ Text, ※ IS/RefMan, ※ EndNote (xml)