TY - CPAPER AU - Simon, C.S. AU - Boulch, C. AU - Carbonnier, P. AU - Contrepois, P. AU - Daniel-Thomas, P. AU - Éozénou, F. AU - Gasser, Y. AU - Gouit, F. AU - Kruse, J. AU - Napoly, O. AU - Nölle, D. AU - Novo, J. AU - Rouvière, N. AU - Schalwat, M. AU - Servouin, C. AU - Vilcins, S. TI - Production Process for the European XFEL Re-Entrant Cavity BPM J2 - Proc. of IBIC2014 AB - As In-Kind contributor to the E-XFEL project, CEA is committed to the procurement of around one third (31) cold beam position monitors (BPM) of the re-entrant RF cavities type and to the assembly on the Saclay site of the 101 cryomodules of the superconducting linac. Each cryomodule is equipped with a beam position monitor connected to a quadrupole at the high-energy end of the cavity string. The industrial process of those BPMs, used in an ultra-clean environment at cryogenic temperature, includes several steps and involves a quality control in collaboration with industrial partners. This paper describes the different steps of the re-entrant cavity BPM fabrication process: machining, copper coating, thermal treatment, EB welding, cleaning and mounting in clean room on the quadrupole. Problems encountered and the lessons learnt will be also reported. PB - JACoW CY - Geneva, Switzerland SP - 307 EP - 310 KW - cavity KW - cryomodule KW - quadrupole KW - vacuum KW - controls DA - 2014/10 PY - 2014 SN - 978-3-95450-141-0 UR - http://jacow.org/IBIC2014/papers/tupf05.pdf ER -