MOA1C01 History of Solid Disk Improvement for Rotating Charge Stripper 17
 
  • H. Hasebe, N. Fukunishi, H. Imao, O. Kamigaito, M. Kase, H. Kuboki, H. Okuno
    RIKEN Nishina Center, Wako, Japan
 
  In 2007, we installed a rotating disk stripper device at the final charge stripping section for the uranium (U) beam acceleration at RIKEN RI Beam Factory. The first rotating carbon disk (C-disk) stripper was useless because of its poor surface flatness and unexpected low density. In 2012, we started the stable U beam operation using beryllium (Be) as the disk material. We successfully improved the flatness of the Be-disk by special polishing technique in 2014, and the transmission efficiency was greatly improved as well. However, it seemed to be impossible that the Be-disk withstood the heat load of the expected intensity in future, considering its deformation. Then, the polishing technique for the Be-disk improvement was applied to the Glassy carbon (GC) disk. The GC-disk flatness was improved maintaining high density. In addition, a tested high-density highly oriented graphite sheet, which is fabricated from a high polymer film in high temperature and high pressure conditions, can be applied as the charge stripping disk since the better stripping efficiency and transmission value than those of Be and the C-disk were realized.  
slides icon Slides MOA1C01 [3.381 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
WEPB01 Status Report on the Operation of the RIBF Ring Cyclotrons 191
 
  • K. Ozeki, T. Dantsuka, M. Fujimaki, T. Fujinawa, N. Fukunishi, H. Hasebe, Y. Higurashi, E. Ikezawa, H. Imao, T. Kageyama, O. Kamigaito, M. Kase, M. Kidera, M. Komiyama, K. Kumagai, T. Maie, M. Nagase, T. Nagatomo, T. Nakagawa, M. Nakamura, J. Ohnishi, H. Okuno, N. Sakamoto, K. Suda, A. Uchiyama, S. Watanabe, T. Watanabe, Y. Watanabe, K. Yamada, H. Yamasawa
    RIKEN Nishina Center, Wako, Japan
  • S. Fukuzawa, M. Hamanaka, S. Ishikawa, K. Kobayashi, R. Koyama, T. Nakamura, M. Nishida, M. Nishimura, J. Shibata, N. Tsukiori, K. Yadomi
    SHI Accelerator Service Ltd., Tokyo, Japan
  • Y. Kotaka
    CNS, Saitama, Japan
 
  Operational status of four ring cyclotrons (RRC, fRC, IRC, SRC) from August 2014 to July 2015 is reported. We are engaging in the improvements and adjustments for increasing beam intensities year after year, and maintenances for the stabilization of beam supply. In these contributions, we will report the past performances of accelerated beams, statistics of operational and tuning time on corresponding period, as well as failures and copings with them.  