Author: Yamamoto, M.
Paper Title Page
MOP211 1-MW Beam Operation Scenario in the J-PARC RCS 68
 
  • H. Hotchi, H. Harada, N. Hayashi, M. Kinsho, P.K. Saha, Y. Shobuda, F. Tamura, K. Yamamoto, M. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie
    KEK, Ibaraki, Japan
 
  The injection energy of the J-PARC RCS will be upgraded from 181 MeV to 400 MeV in the 2013 summer-autumn period. With this upgraded injection energy, we are to aim for 1 MW design output beam power. In this paper, we discuss beam dynamics issues for the 1 MW beam operation and their possible solutions.  
 
TUO3C06 The Result of Beam Commissioning in J-PARC 3-GeV RCS 339
 
  • H. Harada, N. Hayashi, H. Hotchi, M. Kinsho, P.K. Saha, Y. Shobuda, F. Tamura, K. Yamamoto, M. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie, T. Koseki, Y. Sato, K. Satou, M.J. Shirakata
    KEK, Ibaraki, Japan
  • S. Kato
    Tohoku University, Graduate School of Science, Sendai, Japan
 
  J-PARC 3-GeV RCS has started the beam commissioning since Oct. 2007. In the beam commissioning, the beam tuning for basic parameters and high-intensity operation has been continuously performed. This presentation will describe the results of the beam-loss reduction and minimization for high-intensity operation.  
slides icon Slides TUO3C06 [7.753 MB]