Paper |
Title |
Page |
MOP243 |
Experimental Results of Beam Halo at IHEP |
151 |
|
- H.F. Ouyang, T. Huang, J. Li, J. Peng, T.G. Xu
IHEP, Beijing, People's Republic of China
|
|
|
Space-charge forces acting in mismatched beams have been identified as a major cause of beam halo. In this paper, we describe the beam halo experimental results in a FODO beam line at IHEP. With this beam transport line, experiments are firstly carried out to determine the main beam parameters at the exit of a RFQ with intense beams, and then the measured beam profiles at different positions are compared with the multi-particle simulation profiles to study the formation of beam halo. The maximum measured amplitudes of the matched and mismatched beam profiles agreed well with simulations. Details of the experiment will be presented.
|
|
|
TUO1C03 |
The Beam Diagnostics of CSNS |
302 |
|
- T.G. Xu, J.N. Bai, C. Chen, L.X. Han, F. Li, P. Li, M. Meng, J.L. Sun, J.M. Tian, A.X. Wang, B. Wang, M.H. Xu, Zh.H. Xu, X.Y. Yang, L. Zeng
IHEP, Beijing, People's Republic of China
|
|
|
CSNS project is in the construction stage. The overview of CSNS beam diagnostics is presented which includes linac, RCS and both transport beam line. also some predevelopment of CSNS beam diagnostics is presented.
|
|
|
Slides TUO1C03 [8.366 MB]
|
|
|