Author: Kato, S.
Paper Title Page
TUO3C06 The Result of Beam Commissioning in J-PARC 3-GeV RCS 339
 
  • H. Harada, N. Hayashi, H. Hotchi, M. Kinsho, P.K. Saha, Y. Shobuda, F. Tamura, K. Yamamoto, M. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie, T. Koseki, Y. Sato, K. Satou, M.J. Shirakata
    KEK, Ibaraki, Japan
  • S. Kato
    Tohoku University, Graduate School of Science, Sendai, Japan
 
  J-PARC 3-GeV RCS has started the beam commissioning since Oct. 2007. In the beam commissioning, the beam tuning for basic parameters and high-intensity operation has been continuously performed. This presentation will describe the results of the beam-loss reduction and minimization for high-intensity operation.  
slides icon Slides TUO3C06 [7.753 MB]