Paper | Title | Page |
---|---|---|
TUO3C06 | The Result of Beam Commissioning in J-PARC 3-GeV RCS | 339 |
|
||
J-PARC 3-GeV RCS has started the beam commissioning since Oct. 2007. In the beam commissioning, the beam tuning for basic parameters and high-intensity operation has been continuously performed. This presentation will describe the results of the beam-loss reduction and minimization for high-intensity operation. | ||
![]() |
Slides TUO3C06 [7.753 MB] | |