Author: Isinger, M.
Paper Title Page
TUP035 Operation of a Slit Emittance Meter in the MAX IV Gun Test Stand 444
 
  • J. Andersson, F. Curbis, M. Isinger, F. Lindau, S. Werin
    MAX-lab, Lund, Sweden
 
  The MAX IV facility in Lund, Sweden is currently under commissioning. There are two guns in the current MAX IV injector, one thermionic gun for storage ring injection and one photocathode gun for the Short Pulse Facility. There is a possibility of extending the facility to include a Free Electron Laser. To investigate how the beam from the injector can be improved and how to match it to the future requirements for a FEL, the emittance meter from SPARC has been recommissioned at the MAX IV gun test stand. In this paper we report on the progress of this work and results from the first measurements.  
Export • reference for this paper to ※ LaTeX, ※ Text, ※ IS/RefMan, ※ EndNote (xml)