TY - CPAPER AU - Choi, H. J. AU - Gil, K.H. AU - Kang, H.-S. AU - Kim, S.H. AU - Seo, K.W. TI - The BINP HLS to Measure Vertical Changes on PAL-XFEL Buildings and Ground J2 - Proc. of FEL2015 AB - PAL-XFEL is being installed and will be completed by December of 2015 so that users can be supported beginning in 2016. PAL-XFEL equipment should continuously maintain the bunch beam parameter. To this end, PAL-XFEL equipment has to be kept precisely aligned. As a part of the process for installing PAL-XFEL, a surface geodetic network and the installation of a tunnel measurement network inside buildings is in preparation; additionally, the fiducialization of major equipment is underway. After PAL-XFEL equipment is optimized and aligned, if the ground and buildings go through vertical changes during operation, misalignment of equipments will cause errors in the electron beam trajectory, which will lead to changes to the beam parameter. For continuous and systemic measurement of vertical changes in buildings and to monitor ground subsidence (sinks) and uplift, the BINP Ultrasonic-type Hydrostatic Levelling System (HLS) is to be installed and operated in all sections of PAL-XFEL for linear accelerator, undulator and beam line. This study will introduce the operation principle, design concept and advantages (self-calibration) of BINP ULS Sensor, and will outline its installation plan and operation plan. PB - JACoW CY - Geneva, Switzerland SP - 133 EP - 135 KW - timing KW - survey KW - operation KW - experiment KW - alignment DA - 2015/12 PY - 2015 SN - 978-3-95450-134-2 DO - 10.18429/JACoW-FEL2015-MOP047 UR - http://accelconf.web.cern.ch/AccelConf/FEL2015/papers/mop047.pdf ER -