Author: Sanfilippo, S.
Paper Title Page
TUPSO22 Status of SwissFEL Undulator Lines 263
 
  • R. Ganter, M. Aiba, H.-H. Braun, M. Calvi, P. Heimgartner, G. Janzi, H. Jöhri, R. Kobler, F. Löhl, M. Negrazus, L. Patthey, E. Prat, S. Reiche, S. Sanfilippo, U. Schaer, T. Schmidt, L. Schulz, V. Vranković, J. Wickstroem
    PSI, Villigen PSI, Switzerland
 
  An overview of the Aramis Hard-X ray FEL line of SwissFEL is presented, showing its future integration in the tunnel as well as the space reservation for possible future upgrades: Athos Soft X-ray FEL line, post-undulator deflecting cavities. The design of the FEL components like the energy collimator, the matching sections or the dog leg transfer line linking the linac to the future Athos line are almost completed. The characterization of the in-vacuum undulator prototype is described in a companion paper. The installation of the components will start in spring 2015 while the first photons are planned for December 2016 with the alignment and adjustment of the undulators foreseen for first SASE operation by spring 2017 .