WEPD07 Status of the FLASH II Project 381
 
  • K. Honkavaara, S. Ackermann, V. Ayvazyan, N. Baboi, V. Balandin, W. Decking, S. Düsterer, H.-J. Eckoldt, B. Faatz, M. Felber, J. Feldhaus, N. Golubeva, M. Körfer, M. Kuhlmann, T. Laarmann, A. Leuschner, L. Lilje, T. Limberg, N. Mildner, D. Nölle, F. Obier, A. Petrov, E. Plönjes, K. Rehlich, H. Remde, H. Schlarb, B. Schmidt, M. Schmitz, M. Scholz, S. Schreiber, H. Schulte-Schrepping, J. Spengler, M. Staack, N. Stojanovic, K.I. Tiedtke, M. Tischer, R. Treusch, M. Vogt, H.C. Weddig, T. Wohlenberg
    DESY, Hamburg, Germany
  • M. Drescher, A. Hage, V. Miltchev, R. Riedel, J. Rönsch-Schulenburg, J. Roßbach, M. Schulz, A. Willner
    Uni HH, Hamburg, Germany
  • F. Tavella
    HIJ, Jena, Germany
 
  The extension of the FLASH facility at DESY (Hamburg, Germany) - FLASH II Project - is under way. The extension includes a second undulator line with variable gap undulators to allow a more flexible operation, and a new experimental hall for photon experiments. The present FLASH linac will drive the both undulator beamlines. Civil construction of the new buildings has been started in autumn 2011 continuing in several steps until early 2013. The design of the new beamline including the extraction from the FLASH linac and the undulator is mostly finished, and the manufacturing of the components is under way. The mounting of the beamline will start in autumn 2012, and the commissioning with beam is scheduled for second half of 2013. We report here the design of the different phases of the project including the time schedule up to the first user operation.