Paper | Title | Page |
---|---|---|
MOPA06 | Design Studies for a Next Generation Light Source Facility at LBNL | 38 |
|
||
The Next Generation Light Source (NGLS) is a design concept, under development at LBNL, for a 10‐beamline soft x‐ray FEL array powered by a 2.4 GeV superconducting linear accelerator, operating with a 1 MHz bunch repetition rate. The CW superconducting linear accelerator is supplied by a high-brightness, high-repetition-rate photocathode electron gun. Beam is distributed from the linac to the array of independently configurable FEL beamlines with nominal bunch rates up to 100 kHz, with even pulse spacing. Individual FELs may be configured for EEHG, HGHG, SASE, or oscillator mode of operation, and will produce high peak and average brightness x-rays with a flexible pulse format ranging from sub-femtoseconds to hundreds of femtoseconds. |
||
THOAI1 | Femtosecond Synchronization of Laser Systems for the LCLS | 534 |
|
||
The scientific potential of femtosecond x-ray pulses at linac-driven FELs such as the LCLS is tremendous. Time-resolved pump-probe experiments require a measure of the relative arrival time of each x-ray pulse with respect to the experimental pump laser. To achieve this, precise synchronization is required between the arrival time diagnostic and the laser which are often separated by hundreds of meters. For seeded FELs, synchronization is necessary between the seed and pump laser. We describe an optical timing system based on stabilized fiber links which has been developed for the LCLS. Preliminary results show stability of the timing distribution at the sub-20 fsec level. We present details of the results measured during LCLS operation for the first pump-probe experiment in October 2009 and the present user run starting in April 2010. We conclude with a discussion of potential for development. |
||
|