Paper | Title | Page |
---|---|---|
FROB3 | The MAX IV Project | 717 |
|
||
The MAX IV project was given the green light in April 2009. The construction will begin in the near future with aim to have the first beamlines in operation during 2015. The main sources at MAX IV are two storage rings (1.5 GeV and 3 GeV) with state-of-the-art low emittance (*) for the production of soft and hard x-rays. The linac injector will also provide short pulses to a short pulse facility (**). * S C Leemann et al, Beam dynamics for |
||
|