Author: Cenni, E.
Paper Title Page
WEIBLH2054 Operational Experience of CW SRF Injector and Main Linac Cryomodules at the Compact ERL 63
 
  • H. Sakai, K. Enami, T. Furuya, E. Kako, Y. Kondo, S. Michizono, T. Miura, F. Qiu, M. Sato, K. Shinoe, T. Shishido, K. Umemori, K. Watanabe, Y. Yamamoto
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • M. Sawamura
    JAEA, Ibaraki-ken, Japan
 
  We developed ERL injector cryomodule and main linac for Compact ERL (cERL) project. The injector cryomodule includes three 2-cell L-band superconducting cavities. The main linac cryomodule includes two 9-cell L-band superconducting cavities. After construction of cERL injector and recirculaton loop, beam operation was started with 20 MeV beam and after precise beam tuning, energy recovery operation was achieved with more than 80uA. Injector and main linac cavity were stable for ERL beam operation with Digital LLRF system. Field emission is the severe problem for main linac and heating of HOM coupler is the problem for injector. We mainly describe the cavity performances of two cERL cryomodules during long-term beam operation.  
slides icon Slides WEIBLH2054 [13.191 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)