Paper |
Title |
Page |
MOPCP091 |
Status of Beam Diagnostic Components for Superconducting Cyclotron at Kolkata |
236 |
|
- G.P. Pal, R.K. Bhandari, S. Bhattacharya, T. Bhattacharyya, T. Das, C. Mallik, S. Roy
DAE/VECC, Calcutta, India
|
|
|
VEC Centre Kolkata has constructed a K500 superconducting cyclotron (SCC). Several beam diagnostic components have been designed, fabricated and installed in SCC. In the low energy beam line, uncooled slits, faraday cup, beam viewers, and collimators are used. The inflector is also operated in a faraday cup mode to measure the beam inside SCC. The radial probe and viewer probe are respectively used to measure beam current and to observe the beam size and shape inside SCC. The magnetic channels, electro-static deflectors and M9 slit are also used to measure beam current at the extraction radius. Water cooled faraday cup and beam viewers are used in the external beam line. The radius of curvature of the radial probe track was reduced to align the internal and external track during its assembly. It was observed that the probe did not functioning properly during beam trials. Different modifications were incorporated. But, problem with the probe persisted. The paper describes the beam diagnostic components used in the cyclotron, discusses the problems faced in operating the radial probe, modifications tried and outlines the future steps planned to operate the beam diagnostic components.
|
|
|
MOPCP093 |
Beam Extraction System and External Beam Line of Kolkata Superconducting Cyclotron |
242 |
|
- J. Debnath, S. Bhattacharya, T. Bhattacharyya, U. Bhunia, P.S. Chakraborty, M.K. Dey, C. Mallik, Z.A. Naser, G.P. Pal, S. Paul, J. Pradhan
DAE/VECC, Calcutta, India
|
|
|
All the major components of the extraction system of the Kolkata superconducting cyclotron are installed and functional. It includes the Electrostatic deflectors, magnetic channels, M9 slit etc. Internal beam acceleration has already been done successfully and now we are on the verge of extracting and transporting the beam to the cave. The external beam transport system has been designed comprising of quadrupole magnets, steering magnets, switching magnets, beam diagnostics etc. One of the four beam lines has been installed, which extends 20 meters up to the experimental cave - 1. Control and monitoring system for all these components have been developed and tested. All the beam dynamical and technical aspects of the beam extraction and beam transportation have been discussed in this paper.
|
|
|
MOPCP076 |
Operational Experience of Superconducting Cyclotron Magnet at VECC, Kolkata |
203 |
|
- U. Bhunia, M. Ahmed, R.K. Bhandari, T. Bhattacharyya, M.K. Dey, R. Dey, A. Dutta, A. Dutta Gupta, C. Mallik, C. Nandi, Z.A. Naser, G.P. Pal, U. Panda, S. Paul, J. Pradhan, S. Saha
DAE/VECC, Calcutta, India
|
|
|
The Kolkata Superconducting cyclotron magnet has been operational in the center since last few years and enabled us to extensively map magnetic fields over a year covering the operating range of the machine and successful commissioning of internal beam. The magnet cryostat coupled with the liquid helium refrigerator performs satisfactorily with moderate currents (<550A) in both the coils. The superconducting coil did not undergo any training and over the years has not suffered from any quench. Author would share the experience and difficulties of enhanced overall heat load to the liquid helium refrigerator at higher excitations of coils. This creates instability in the operation of liquid helium refrigerator and finally leads to slow dump. Rigorous study has been carried out in this regard to understand the problems and operational logic of liquid helium refrigerator has been modified accordingly to alleviate from. Some other measures have also been taken from cryostat and cryogenic distribution point of view in order to reduce the heat load at higher excitations.
|
|
|