TUPAN097 Studies of Beam Losses from Failures of SPS Beam Dump Kickers 1607
 
  • T. Kramer, G. Arduini, O. E. Berrig, E. Carlier, L. Ducimetiere, B. Goddard, A. Koschik, J. A. Uythoven
    CERN, Geneva
 
  The SPS beam dump extraction process was studied in detail to investigate the possibility of operation with reduced kicker voltage and to fully understand the trajectory and loss pattern of the mis-kicked beams. This paper briefly describes the SPS beam dump process, and presents the tracking studies carried out for failure cases. The simulation results are compared to the results of measurements made with low intensity beams.  
TUPAN098 Beam Commissioning of the SPS LSS6 Extraction and TT60 for LHC 1610
 
  • B. Goddard, B. Balhan, E. H.R. Gaxiola, M. Gourber-Pace, L. K. Jensen, V. Kain, A. Koschik, T. Kramer, J. A. Uythoven, H. Vincke, J. Wenninger
    CERN, Geneva
 
  The new fast extraction system in LSS6 of the SPS and the first 100 m of transfer line TT60 was commissioned with low intensity beam in late 2006. The layout and functionality of the main elements are briefly explained, including the various hardware subsystems and the control system. The systems safety procedures, test objectives and measurements performed during the beam commissioning are described.  
TUZAC03 LHC Machine Protection 878
 
  • R. Schmidt, R. W. Assmann, E. Carlier, B. Dehning, R. Denz, B. Goddard, E. B. Holzer, V. Kain, B. Puccio, B. Todd, J. A. Uythoven, J. Wenninger, M. Zerlauth
    CERN, Geneva
 
  This paper addresses the imposing challenges of the LHC Machine Protection System.  