Kwon, H.-J.

Paper Title Page
TUPAN077 Error Analysis of the PEFP 100 MeV Linac 1550
 
  • J.-H. Jang, Y.-S. Cho, K. Y. Kim, H.-J. Kwon
    KAERI, Daejon
 
  Funding: This work was supported by the 21C Frontier R&D program in Mnistry of Science and Technology of the Korean Government.

The 100 MeV Linac of the Proton Engineering Frontier Project (PEFP) consists of an ion source, a low energy beam transport (LEBT), a 3 MeV radio frequency quadrupole (RFQ), and an 100 MeV drift tube linac (DTL). The DTL is separated into two parts. The first part includes 4 tanks which accelerate 20 mA proton beams up to 20 MeV. The medium energy beam transport (MEBT) follows the 20 MeV accelerator in order to match proton beams into the next linac as well as to extract and supply 20 MeV proton beams to the user facilities. The second part of the DTL consists of 7 tanks to accelerate proton beams to 100 MeV. This work focuses on the error analysis of the designed 100 MeV linac in order to obtain the tolerance limit in the fabrication and alignment processes of the linac as well as to study the steering magnets which control the beam fluctuations and reduce the potential beam loss.

 
WEPMN057 Development of the PEFP Low Level RF Control System 2167
 
  • H. S. Kim, Y.-S. Cho, I.-S. Hong, D. I. Kim, H.-J. Kwon, K. T. Seol, Y.-G. Song
    KAERI, Daejon
 
  Funding: This work is supported by the 21C frontier R&D program in the Ministry of Science and Technology of the Korean government.

The RF amplitude and the phase stability requirements of the LLRF system for the PEFP(Proton Engineering Frontier Project) proton linac are within 1% and 1 degree, respectively. As a prototype of the LLRF, a simple digital PI control system based on commercial FPGA board is designed and tested. The main features are a sampling rate of 40 MHz which is four times higher than the down-converted cavity signal frequency, digital in-phase and quadrature detection, pulsed mode operation with the external trigger, and a simple proportional-integral feedback algorithm implemented in a FPGA. The developed system was tested with 3 MeV RFQ and 20 MeV DTL, and satisfied the stability requirements.

 
WEPMN058 Analog Components Configuration and Test results for PEFP LLRF system 2170
 
  • K. T. Seol, Y.-S. Cho, D. I. Kim, H. S. Kim, H.-J. Kwon
    KAERI, Daejon
 
  Funding: This work is supported by the 21C Frontier R&D program in the Ministry of Science and Technology of the Korean government.

The PEFP LLRF system for the 3MeV RFQ and 20MeV DTL has been developed. The stability of ±1% in the amplitude and ±1˚ in the phase is required. Therefore, the drift of the analog components should be low to satisfy the requirement. Analog chassis as a prototype of LLRF system is configured and tested. RF components including an IQ modulator, an RF switch, a mixer, phase comparators, RF splitters, RF filters and trip circuit for high VSWR are installed in this chassis. This performs the shift of RF amplitude and phase from IQ signal, down-conversion to 10MHz IF signal, interlock for arc and high VSWR, and RF/clock distribution. The amplitude and phase stability of each component are measured to check the effect on the whole system performance. The detailed configuration and test results are presented.

 
WEPMN061 Design of Cooling System for Resonance Control of the PEFP DTL 2176
 
  • K. R. Kim, W. H. Hwang, H. S. Kim, H.-G. Kim, S. J. Kwon, J. Park, J. C. Yoon
    PAL, Pohang, Kyungbuk
  • Y.-S. Cho, H.-J. Kwon
    KAERI, Daejon
 
  Funding: Supported by the 21st PEFP (KAERI) and MOST in Korea

The temperature-controlled cooling water system was designed to obtain the resonance frequency stabilization of the normal conducting drift tube linac (DTL) for the PEFP 100 MeV proton accelerator. The primary sizing of individual closed-loop low conductivity cooling water pumping skids for each DTL system was conducted with a simulation of thermo-hydraulic network model. The temperature control schemes incorporating the process dynamic model of heat exchangers were examined to regulate the input water temperatures into the DTL during the steady state operation. The closed water circuits to achieve system performance and stability for low and full duty operation modes were discussed, and numerical results were also presented.

 
FRPMN056 Beam Current and Energy Measurement of the PEFP 20 MeV Accelerator 4129
 
  • H.-J. Kwon, Y.-S. Cho, I.-S. Hong, J.-H. Jang, D. I. Kim, H. S. Kim, K. T. Seol
    KAERI, Daejon
 
  Funding: This work is supported by the 21C Frontier R&D program in the Ministry of Science and Technology of the Korean government.

The beam test of the Proton Engineering Frontier Project (PEFP) 20 MeV proton linear accelerator started again, after the upgrade of the RF control system, One of the important goals of the test is to increase the beam current to the design level. Tuned current transformers were installed along the DTL tanks to measure the beam current itself and possible beam loss along the accelerator. Because there were no empty drift tubes, the current transformers should be installed between DTL tanks. Therefore, the tuning plans were developed to obtain the desired beam properties with the limited number of beam diagnostic devices. Also two BPMs for the time of flight measurement and energy degrader were installed at the end of the 20 MeV accelerator to measure the beam energy. In this paper, the overall test results including beam current and energy measurement are presented.