Paper |
Title |
Page |
FPAE004 |
Optical Matching of Slowly Extracted Beam with Transport System at HIMAC
|
910 |
|
- T. Furukawa, K. Noda, E. Takada, M. Torikoshi, T.H. Uesugi, S. Yamada
NIRS, Chiba-shi
- T. Fujimoto, M. Katsumata, S. Shibuya, T. Shiraishi
AEC, Chiba
|
|
|
The optical matching between the ring and the transport line plays important role in order to control the beam size and profile after the transport. At HIMAC, thus, we have studied the optical matching of the slowly extracted beam. As a result, it was verified that the beam size of the slowly extracted beam were controlled owing to the optical matching. It was also found that small deviation of quadrupole strength in the ring brings orbit distortion at the transport system.
|
|
FPAE005 |
Characteristics of Injected Beam at HIMAC Synchrotron
|
952 |
|
- T.H. Uesugi, T. Furukawa, K. Noda, S. Shibuya
NIRS, Chiba-shi
|
|
|
At the HIMAC synchrotron, we have carried out the tune survey with the lifetime measurement in order to obtain the high intensity. Under the relatively high intensity, it was observed that a part of the circulating beam was lost due to the coherent oscillation in both the horizontal and the vertical direction. Taking account of the tune shift and spreads, the working point was optimized so as to avoid resonance line. We will describe the experimental result.
|
|