MPPP011 | Fermilab Recycler Damper Requirements and Design | 1239 |
|
||
The design of transverse dampers for the Fermilab Recycler storage ring is described. An observed instability and analysis of subsequent measurements are used to identify the requirements. The digital approach being mplemented is presented. | ||
ROPC006 | Commissioning of Fermilab's Electron Cooling System for 8-GeV Antiprotons | 540 |
|
||
A 4.3-MeV electron cooling system has been installed at Fermilab in the Recycler antiproton storage ring and is being currently commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper will report on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons. |