Paper | Title | Page |
---|---|---|
TPPT050 | Rod-Loaded and PBG Multi-Beam Klystron Cavities | 3094 |
|
||
Funding: Work supported by DOE SBIR Grant No. DE-FG02-03ER83845. Performance of PBG-like structures was studied for multi-defect and single-defect metal cavities. Conceptual designs of a 6-beam, X-band, multi-beam klystron (MBK) demonstrate feasibility of high power generation with efficiency ~63% in a compact structure. Sheet-beam and annular-beam rod-loaded configurations were also investigated. |
||
WPAT081 | Ceramic Power Extractor Design at 15.6 GHz | 4078 |
|
||
Funding: Work supported by DOE SBIR Grant No. DE-FG03-01ER83232. Power extractor and coupler designs developed for an experiment planned at the 12th beam harmonic of the upgraded Advanced Wakefield Accelerator (AWA) facility is described. New features are an upstream HOM dielectric damper with additional tapering, and a single-port coupler considered in two variants. Performance analysis includes coupler geometric tolerances, overvoltage, dipole mode wake and BBU; and wakefield losses induced in the damper. |