Commissioning Status of the Dalian Cohernet Light Source |
2709 |
|
- G.L. Wang
DICP, Dalian, People's Republic of China
|
|
|
The Dalian Coherent Light Source (DCLS) is a seeded FEL user facility working at 50-150 nm, now under commissioning in Dalian, China. The facility consists of a 300 MeV normal-conducting S-band linear accelerator (LINAC) and two undulator beamlines. The first beam-line (FEL-1) will provide picosecond FEL radiation with the pulse energy up to several hundreds micro-joule, the second beam-line (FEL-2) will be a femtosecond and polarization FEL. The LINAC and FEL-1 beam-line construction was complete by the summer of 2016, the installation of FEL-2 is in preparation. High power RF conditioning of the LINAC started in August 2016 and the beam commissioning initiated 3 months later. This article describes the commissioning status of DCLS, reports on the goals achieved so far.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-WEPAB058
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|