Author: Tishchenko, V.
Paper Title Page
MOPIK110 Update on Bmad Simulations From Target to Storage Ring for the New Muon G-2 Experiment at Fermilab 791
 
  • M. Korostelev, I.R. Bailey, A.T. Herrod, A. Wolski
    Cockcroft Institute, Warrington, Cheshire, United Kingdom
  • I.R. Bailey
    Lancaster University, Lancaster, United Kingdom
  • A.T. Herrod, A. Wolski
    The University of Liverpool, Liverpool, United Kingdom
  • D. Stratakis
    Fermilab, Batavia, Illinois, USA
  • V. Tishchenko
    BNL, Upton, Long Island, New York, USA
 
  The new muon g-2 experiment at Fermilab (E989) aims to measure the anomalous magnetic moment of the muon to an uncertainty of 140 ppb. The existing accelerator facility at Fermilab is being adapted to the requirements of the g-2 experiment and the baseline lattice design is now established. This paper presents the results of beam simulations and spin tracking carried out using the Bmad software package for the g-2 beam transport system, including a variant which bypasses the delivery ring as proposed for the beam commissioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPIK110  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPIK120 Simulated performance of the Production Target for the Muon g-2 Experiment at Fermilab 3234
 
  • D. Stratakis, M.E. Convery, J.P. Morgan, D.A. Still, M.J. Syphers
    Fermilab, Batavia, Illinois, USA
  • M.J. Syphers
    Northern Illinois University, DeKalb, Illinois, USA
  • V. Tishchenko
    BNL, Upton, Long Island, New York, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy.
The Muon g-2 Experiment plans to use the Fermilab Recycler Ring for forming the proton bunches that hit its production target. The proposed scheme uses one RF system, 80 kV of 2.5 MHz RF. In order to avoid bunch rotations in a mismatched bucket, the 2.5 MHz is ramped adiabatically from 3 to 80 kV in 90 ms. In this study, the interaction of the primary proton beam with the production target for the Muon g-2 Experiment is numerically examined.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPIK120  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)