Author: Sidorin, A.O.
Paper Title Page
WEPVA014 Status of R&D on New Superconducting Injector Linac for Nuclotron-NICA 3282
 
  • G.V. Trubnikov, A.V. Butenko, N. Emelianov, A.O. Sidorin, E. Syresin
    JINR, Dubna, Moscow Region, Russia
  • T.A. Bakhareva, M. Gusarova, T. Kulevoy, S.V. Matsievskiy, S.M. Polozov, A.V. Samoshin, N.P. Sobenin, D.V. Surkov, K.V. Taletskiy, S.E. Toporkov, V. Zvyagintsev
    MEPhI, Moscow, Russia
  • A.A. Bakinowskaya, A.A. Marysheva, V.S. Petrakovsky, I.L. Pobol, A.I. Pokrovsky, D.A. Shparla, S.V. Yurevich, V.G. Zaleski
    Physical-Technical Institute of the National Academy of Sciences of Belarus, Minsk, Belarus
  • M.A. Baturitski, S.A. Maksimenko
    INP BSU, Minsk, Belarus
  • S.E. Demyanov
    Scientific-Practical Materials Research Centre of the National Academy of Sciences of Belarus, Minsk, Belarus
  • V.A. Karpovich
    BSU, Minsk, Belarus
  • T. Kulevoy, S.M. Polozov
    ITEP, Moscow, Russia
  • A.A. Kurayev, V.V. Matbeenko, A.O. Rak
    Belarus State University of Informatics and Radioelectronics (BSUIR), Minsk, Belarus
  • V.N. Rodionova
    Belarussian State University, Scientific Research Institute of Nuclear Problems, Minsk, Belarus
  • A.O. Sidorin
    Saint Petersburg State University, Saint Petersburg, Russia
  • V. Zvyagintsev
    TRIUMF, Vancouver, Canada
 
  The new collaboration of JINR, NRNU MEPhI, INP BSU, PTI NASB, BSUIR and SPMRC NASB starts in 2015 the project of linac-injector design in 2015. The goal of new linac is to accelerate protons up to 25 MeV (and up to 50 MeV at the second stage) and light ions to ~7.5 MeV/u for Nuclotron-NICA injection. Current results of the linac general design and development, beam dynamics simulations, SC cavities design and SRF technology development are presented in this report.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA014  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPVA116 Commissioning of the New Heavy Ion Linac at the NICA Project 2362
 
  • A.V. Butenko, D.E. Donets, A.D. Kovalenko, K.A. Levterov, D.A. Lyuosev, A.A. Martynov, V.V. Mialkovskiy, D.O. Ponkin, K.V. Shevchenko, I.V. Shirikov, A.O. Sidorin
    JINR/VBLHEP, Dubna, Moscow region, Russia
  • A.M. Bazanov, B.V. Golovenskiy, V. Kobets, V.A. Monchinsky, A.V. Smirnov
    JINR, Dubna, Moscow Region, Russia
  • H. Höltermann, D. Mäder, H. Podlech, U. Ratzinger, A. Schempp
    BEVATECH, Frankfurt, Germany
 
  The new accelerator complex Nuclotron-based Ion Collider fAcility (NICA) is now under development and construction at JINR, Dubna. This complex is assumed to operate using two injectors: modernized old Alvarez-type linac LU-20 as the injector of light polarized ions and a new Heavy Ion Linear Accelerator HILAc - injector of heavy ions beams. The new heavy ion linac accelerate ions with q/A values above 0.16 to 3.2 MeV/u is under commissioning. The main components are 4-Rod-RFQ and two IH drift tube cavities is operated at 100.6 MHz. Main results of the HILAc commissioning with carbon beam from the laser ion source are discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA116  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPVA117 Commissioning of New Light Ion RFQ Linac and First Nuclotron Run with New Injector 2366
 
  • A.V. Butenko, A.M. Bazanov, D.E. Donets, K.A. Levterov, D.A. Lyuosev, A.A. Martynov, V.V. Mialkovskiy, D.O. Ponkin, R.G. Pushkar, V.V. Seleznev, K.V. Shevchenko, I.V. Shirikov, A.O. Sidorin
    JINR/VBLHEP, Dubna, Moscow region, Russia
  • S.V. Barabin, A.V. Kozlov, G. Kropachev, T. Kulevoy, V.G. Kuzmichev
    ITEP, Moscow, Russia
  • A. Belov
    RAS/INR, Moscow, Russia
  • V.V. Fimushkin, B.V. Golovenskiy, A. Govorov, V. Kobets, A.D. Kovalenko, V.A. Monchinsky, A.V. Smirnov, G.V. Trubnikov
    JINR, Dubna, Moscow Region, Russia
  • S.M. Polozov
    MEPhI, Moscow, Russia
 
  The new accelerator complex Nuclotron-based Ion Collider fAcility (NICA) is now under development and construction at JINR, Dubna. This complex is assumed to operate using two injectors: the Alvarez-type linac LU-20 as injector of light ions, polarized protons and deuterons and a new linac HILAc - injector of heavy ions beams. Old DC for-injector of the LU-20, which operated from 1974, is replaced by the new RFQ accelerator, which was commissioned in spring 2016. The first Nuclotron technological run with new fore-injector was performed in June 2016. Beams of D+ and H2+ were successfully injected and accelerated in the Nuclotron ring. Main results of the RFQ commissioning and the first Nuclotron run with new for-injector is discussed in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA117  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)