Author: Servouin, C.
Paper Title Page
MOPVA044 Conditioning of the Power Couplers for the ESS Elliptical Cavity Prototypes 957
 
  • C. Arcambal, P. Carbonnier, M. Desmons, G. Devanz, T. Hamelin, C. Marchand, C. Servouin
    CEA/DRF/IRFU, Gif-sur-Yvette, France
  • C. Darve
    ESS, Lund, Sweden
 
  In the framework of the European Spallation Source (ESS), some power couplers have been designed and manufactured to supply, with RF power, the medium-beta (β=0.67) elliptical cavities of the cryomodule demonstrator. The power couplers work at 704.4 MHz and are tested up to 1.2 MW (repetition rate=14 Hz, RF pulse width close to 3.6 milliseconds). The CEA Saclay is in charge of the design, the manufacturing, the preparation and the conditioning of these power couplers. In this paper, after a general presentation of the power couplers used in the ESS LINAC and their characteristics, we give some détails about the manufacturing and then we describe the different steps of the preparation (cleaning), the assembly of the couplers on the coupling box in cleanroom, the baking of the couplers and the conditioning procedure. Finally, the experimental results obtained in travelling and standing waves on the first pairs of couplers will be shown.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA044  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPVA039 Manufacturing and Validation Tests of IFMIF Low-Beta HWRs 942
 
  • G. Devanz, F. Éozénou, L. Maurice, P. Sahuquet, C. Servouin
    CEA/DSM/IRFU, France
  • N. Bazin, P. Carbonnier, P. Charon, G. Disset, P. Hardy, E. Jacques, O. Piquet, D. Roudier
    CEA/IRFU, Gif-sur-Yvette, France
  • J.K. Chambrillon, T. Percerou
    CEA/DRF/IRFU, Gif-sur-Yvette, France
 
  The IFMIF accelerator aims to provide an accelerator-based D-Li neutron source to produce high intensity high energy neutron flux to test samples as possible candidate materials to a full lifetime of fusion energy reactors. A prototype of the low energy part of the accelerator is under construction at Rokkasho in Japan. It includes one cryomodule containing 8 half-wave resonators (HWR) operating at 175 MHz .The first manufactured HWR has passed low power tests at 4.2K in vertical cryostat succesfully and exceeds the specifications. It has also been tested in the dedicated horizontal Sathori cryostat equiped with its cold tuning system. The serial production and qualification tests of the 8 cavities which will eventually equip the cryomodule are carried out in parallel. In this paper, we focus on the HWR preparation and test results and give a status of the manufacturing activities.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA039  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPVA041 Vertical Test Results on ESS Medium and High Beta Elliptical Cavity Prototypes Equipped with Helium Tank 948
 
  • E. Cenni
    CEA/IRFU, Gif-sur-Yvette, France
  • P. Bosland, G. Devanz, F. Éozénou, X. Hanus, L. Maurice, F. Peauger, J. Plouin, D. Roudier, C. Servouin
    CEA/DSM/IRFU, France
  • G. Costanza
    Lund University, Lund, Sweden
  • C. Darve
    ESS, Lund, Sweden
 
  The ESS elliptical superconducting Linac consists of two types of 704.42 MHz cavities, medium and high beta, to accelerate the beam from 216 MeV (spoke cavity Linac) up to the final energy at 2 GeV. The last Linac optimization, called Optimus+, has been carried out taking into account the limitations of SRF cavity performance (field emission). The medium and high-beta parts of the Linac are composed of 36 and 84 elliptical cavities, with geometrical beta values of 0.67 and 0.86 respectively. This work presents the latest vertical test results on ESS medium and high beta elliptical cavity prototypes equipped with helium tank. We describe the cavity preparation procedure from buffer chemical polishing to vertical test.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA041  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPVA043 Assembly Preparation of the IFMIF SRF Cryomodule 954
 
  • J.K. Chambrillon, N. N'Doye
    CEA/DRF/IRFU, Gif-sur-Yvette, France
  • N. Bazin, P. Charon, G. Devanz, P. Hardy, O. Piquet, J. Plouin
    CEA/IRFU, Gif-sur-Yvette, France
  • P. Contrepois, C. Servouin
    CEA/DSM/IRFU, France
 
  This article presents the preparation work performed by CEA for the assembly of the IFMIF Cryomodule. Before the shipping of the components to Japan many tests and trial assemblies has been realized on the CEA site of Saclay, France. The cryomodule, which is part of the Linear IFMIF Prototype Accelerator (LIPAc) under construction at Rokkasho in Japan, will be assembled there under the responsibility of F4E (Fusion for Energy) with CEA assistance. To fulfill the assembly of the cavity string, a cleanroom will be built at Rokkasho under the responsibility of QST.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA043  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)