Author: Schempp, A.
Paper Title Page
TUPVA116 Commissioning of the New Heavy Ion Linac at the NICA Project 2362
 
  • A.V. Butenko, D.E. Donets, A.D. Kovalenko, K.A. Levterov, D.A. Lyuosev, A.A. Martynov, V.V. Mialkovskiy, D.O. Ponkin, K.V. Shevchenko, I.V. Shirikov, A.O. Sidorin
    JINR/VBLHEP, Dubna, Moscow region, Russia
  • A.M. Bazanov, B.V. Golovenskiy, V. Kobets, V.A. Monchinsky, A.V. Smirnov
    JINR, Dubna, Moscow Region, Russia
  • H. Höltermann, D. Mäder, H. Podlech, U. Ratzinger, A. Schempp
    BEVATECH, Frankfurt, Germany
 
  The new accelerator complex Nuclotron-based Ion Collider fAcility (NICA) is now under development and construction at JINR, Dubna. This complex is assumed to operate using two injectors: modernized old Alvarez-type linac LU-20 as the injector of light polarized ions and a new Heavy Ion Linear Accelerator HILAc - injector of heavy ions beams. The new heavy ion linac accelerate ions with q/A values above 0.16 to 3.2 MeV/u is under commissioning. The main components are 4-Rod-RFQ and two IH drift tube cavities is operated at 100.6 MHz. Main results of the HILAc commissioning with carbon beam from the laser ion source are discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA116  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB148 Investigation of a Splitring-RFQ for High Current Ion Beams at Low Frequencies 1680
SUSPSIK042   use link to see paper's listing under its alternate paper code  
 
  • M. Baschke, H. Podlech, A. Schempp
    IAP, Frankfurt am Main, Germany
 
  For hadron linacs RFQs are the first stage of acceleration. To reach high intensities a new Splitring-RFQ is investigated. Not only a high current and high beam quality/brilliance should be achieved, also a good tuning flexibility and comfort for maintenance are part of the study. It will consist of two stages with 27 MHz and 54 MHz to accelerate ions with an A/q of 60 up to energies of 200 keV/u. Therefor RF simulations with CST MWS were done to study the quality factor and the shunt impedance as well as tuning possibilities. First results and the status of the project will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPAB148  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPVA071 The MYRRHA-RFQ - Status and First Measurements 2243
 
  • H. Podlech, K. Kümpel, C. Lorey, N.F. Petry, A. Schempp, P.P. Schneider
    IAP, Frankfurt am Main, Germany
  • A. Bechtold
    NTG, Gelnhausen, Germany
  • C. Zhang
    GSI, Darmstadt, Germany
 
  Funding: H2020, European Commission, grant agreement number 662186 (MYRTE)
The MYRRHA project requires a proton linac with an energy of 600 MeV with a beam current of 4 mA in cw operation. As first RF structure a 176 MHz 4-Rod RFQ has been chosen because of tuning possibilities, maintenance, lower capital costs and technological risk compared to a 4-Vane-RFQ. The aim of beam dynamics design was to preserve excellent beam quality and to avoid the creation of halo particles especially in the longitudinal plane. Using the NFSP (New Four-Section Procedure) with a soft and symmetric pre-bunching with full 360° acceptance it was possible to reach the requirements. The simulated transmission of the 4 m long RFQ is close to 100%. The electrode voltage has been chosen to 44 kV which gives enough transverse focusing but limits the required RF losses to about 25 kW/m. The cooling has been optimized for reliable operation and a new method of dipole compensation has been applied. The RFQ has been built and tuned with respect to field flatness. The paper describes the status of the RFQ and first measurements.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA071  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPVA006 Space-Charge Compensation in the Transition Area Between LEBT and RFQ 4425
SUSPSIK061   use link to see paper's listing under its alternate paper code  
 
  • P.P. Schneider, D. Born, V.A. Britten, M. Droba, O. Meusel, H. Podlech, A. Schempp
    IAP, Frankfurt am Main, Germany
  • D. Noll
    CERN, Geneva, Switzerland
 
  Funding: This work is supported by the German Federal Ministry of Education and Research (BMBF) #05P15RFRBA and by HORIZON 2020 for the MYRRHA project #662186
The transition from a space charge compensated beam in the LEBT to an uncompensated beam in the RFQ will influence the beam parameters. To investigate the impact of the electric fields on the space charge compensation, an insulated cone is used as a repeller electrode in front of the RFQ. Depending on the time dependent potential of the RFQ rods respectively to the beam potential, the compensation electrons may be prevented from moving into the RF field which oozes out of the RFQ entrance. The simulation studies are performed with the particle-in-cell code bender*. The simulations may substantiate measurements at the CW-operated RFQ in Frankfurt University** as well as at the foreseen MYRRHA LEBT-RFQ interface.*** In this contribution, a study on a LEBT-RFQ interface is shown. Results of numerical and experimental investigations will be compared.
*Noll, D. et al.The Particle-in-Cell Code Bender and Its Application to Non-Relativistic Beam Transport, WEO4LR02, HB'14
**Meusel, O. et al.FRANZ Accelerator Test Bench and Neutron Source.,MO3A03, LINAC'12
***R. Salemme et al.Design Progress of the MYRRHA Low Energy Beam Line, MOPP137, LINAC'14
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPVA006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)