Author: Sagalo, P.     [Sagało, P.]
Paper Title Page
TUPIK071 The Novel Implementation of the Orbit Correction Algorithm for Solaris Storage Ring 1861
 
  • P. Sagało, Ł.J. Dudek, A. Kisiel, G.W. Kowalski, A.I. Wawrzyniak
    Solaris National Synchrotron Radiation Centre, Jagiellonian University, Kraków, Poland
  • P.P. Goryl
    3controls, Kraków, Poland
 
  The storage ring which is located in the National Synchrotron Radiation Center SOLARIS works under the TANGO control system. So far the correction of an electron beam orbit has been performed with an algorithm implemented in the Matlab Middle Layer (MML). To ensure consistency of the correction process with the entire control system, a new implementation of this algorithm has been developed. The algorithm of orbit correction based on SVD has been implemented as a TANGO Device, which is one of the fundamental blocks used in the Tango control system. The entire code has been written in the Python.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPIK071  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEOCA1 Performance of SOLARIS Storage Ring 2490
 
  • A.I. Wawrzyniak, P.B. Borowiec, M.B. Jaglarz, A. Kisiel, P.M. Klimczyk, M.A. Knafel, M.P. Kopeć, A.M. Marendziak, S. Piela, P. Sagało, M.J. Stankiewicz, K. Wawrzyniak, M. Zając
    Solaris National Synchrotron Radiation Centre, Jagiellonian University, Kraków, Poland
 
  After one year of the Solaris storage ring commission-ing excellent performance has been achieved. The optics was corrected close to the design values. However, some minor adjustments are still needed. The commissioning of the Solaris 1.5 GeV storage ring required a big effort in machine parameters optimization. Performance of posi-tion monitoring devices has proven essential for the suc-cessful optimization of beam parameters such as: closed orbit, tune, chromaticity, and dispersion. Now, the effort is focused on fine-tuning the machine by implementing the linear optics from orbit correction (LOCO) and reduc-ing the disparity between model and measured results revealed by the phase advance analysis and dispersion measurement. Moreover, during daily operation the main task is to maintain long-term stability of the circulating electron beam allowing for beamlines commissioning. Within this presentation the current status of the Solaris facility and the commissioning results will be reported.  
slides icon Slides WEOCA1 [13.180 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEOCA1  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)