  Value engineering is an important part of the process of designing and realising large-scale installations such as high power accelerators. This typically occurs during the later part of the design stage of the system, however such exercises may also be requested by funding bodies at later stages in order to manage project contingency. Naturally, the later this is done, the more challenging it becomes. In this paper we report on a recently concluded Value Engineering effort at the European Spallation Source. The challenges presented by the initiation of such an exercise during the construction phase are discussed. In addition, we present and discuss the various options that we examined, and indicate the philosophy and figures of merit used to narrow down these options. The final conclusion will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPIK040  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPVA131 Beam Commissioning Planning Updates for the ESS Linac 2407
 
  • D.C. Plostinar, M. Eshraqi, R. Miyamoto, M. Muñoz
    ESS, Lund, Sweden
 
  The European Spallation Source (ESS) is a flagship research facility currently under construction in Lund, Sweden. It is driven by a 2 GeV linac, accelerating a 62.5 mA proton beam at a 4% duty cycle. With an average beam power of 5 MW, when completed the ESS linac will become the world's most powerful. In this paper we summarise the latest beam commissioning plans from the ion source to the target, highlighting the individual phases, the beam dynamics challenges as well as the scheduling strategy.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA131  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPVA013 Benchmarking of the ESS LEBT in TraceWin and IBSimu 4445
 
  • Ø. Midttun
    University of Bergen, Bergen, Norway
  • Y.I. Levinsen, R. Miyamoto, D.C. Plostinar
    ESS, Lund, Sweden
 
  The modeling of the proton beam in the ESS accelerator starts with a beam distribution as an input to the TraceWin code currently used as the simulation tool. This input is typically a Gaussian distribution, a distribution from other codes, or data from an emittance measurement. The starting point of these simulations is therefore located somewhere along the low energy beam transport (LEBT) close to the ion source. In this paper, we propose to use IBSimu to model the beam extraction from the ion source, which provides an input beam distribution to TraceWin. IBSimu is a computer simulation package for ion optics, plasma extraction, and space charge dominated ion beam transport. We also present a benchmarking of the beam tracking through the LEBT using both these tools, and propose a transition interface to handover the beam distribution from IBSimu to TraceWin.  